This 318,200 SF general merchandise distribution center was completed 11 months after construction began. The exterior walls are an insulated “sandwich” panel system with an integral color that provide a durable and attractive exterior façade as well as the high-impact resistence of a concrete interior wall. Over 16,400 cubic yards of concrete was placed and finished during construction of this facility, which features a state-of-the-art computerized conveyor system.